To complete the gas line relocation a concrete base is being installed to support the gas meter and a protective cage. Asphalt will cover the area around the base and extent just north of the Electric Theatre fire exit door. Roman pavers will continue along the west side of the General Store to the end of the walkway. With dedicated drains for surface water and new downspout inlets for roof drainage, flooding in this area will no longer be a problem.
No comments:
Post a Comment