|
Before |
|
After | |
Drainage improvements to the General Store walkway are almost complete. The broken asphalt has been replaced by roman pavers and a retaining wall was constructed to hold back the soil. New drainage lines have been installed for the downspouts and catch basins will now drain away any surface water from the lawn. Several sections of water damaged siding will also be replaced. The gas meter at the south end of the walkway was upgraded to present day seismic standards and a proper metal cage was also fitted around the meter. For special events power points where added to the north side of stride studio.
No comments:
Post a Comment